Tender conditions
The environmental protection inspection and acceptance of the two projects of Qingyuan 110kv Fenghua (Pak Sha) Power Transmission and Transformation Project, including the bid invitation project, was approved by Radio Broadcasting [2011] No. 434 and Qing Power Supply Plan [2016] No. 36. The project construction unit is Guangdong Power Grid. The Qingyuan Power Supply Bureau of the limited liability company, the construction fund is its own funds and bank loans, and the bidder is Qingyuan Power Supply Bureau of Guangdong Power Grid Co., Ltd. The project has already met the conditions for tendering and is currently bidding for the project's services.
2. Project overview and scope of tender
2.1 Construction site: Qingyuan
2.2 Construction Scale: The tender for this project includes the environmental protection acceptance service of 2 projects: Qingyuan 110kv Fenghua (Paksha) Power Transmission and Transformation Project, Qingyuan 110kv Guangqing City Rail Longtang Traction Station Access System Project Environmental protection acceptance service.
2.3 Plan duration: one year (actually based on the implementation of the project, both parties complete the entrusted work content)
2.4 Bidding scope: Technical assessment of the completion acceptance of water and soil conservation facilities for power transmission and transformation projects, preparation of a “Summary Report on Soil and Water Conservation Work†and “Technical Assessment Report for Acceptance of Water and Soil Conservation Facilitiesâ€, which were reviewed by the relevant water administrative department and finally obtained. The relevant water administrative department's (pass) approval.
2.5 Division of tenders: The tender for this project is divided into 1 bid section.
3. Bidder qualification requirements
3.1 The bidder has an independent legal personality, holds a valid and valid business license of a corporate legal person or a corporate legal person certificate;
3.2 Qualification Certificate of Grade B and above for environmental impact assessment of power transmission and transformation project with national certification (category of environmental impact report shall include: power transmission and transformation and radio and television communication; category of environmental impact report shall include: special item), no bad business Records of independent corporate or institutional legal entities. Need to be filed with the Guangdong Provincial Department of Environmental Protection or the Qingyuan City Environmental Protection Bureau;
3.3 The person in charge of the project must hold a nationally recognized environmental impact assessment professional qualification certificate (transmission and transformation and radio and television communications or environmental protection acceptance inspection survey), and have intermediate or above professional titles;
3.4 The government in which the project is located and China Southern Power Grid Co., Ltd. and Guangdong Power Grid Co., Ltd. are not subject to restricted bids;
3.5 The project bid does not accept the bid of the consortium;
4. Acquisition of tender documents
4.1 All bidders are interested in participating in the bid, from December 30, 2016 to January 6, 2017, daily from 9:30 to 11:30, and from 4:00 to 16:00 (Beijing time, The same below)
Fiber Pen Nib,Passive Capacitive Stylus Pen,Rubber Tip Stylus Pen,Microsoft Stylus Pen
Shenzhen Ruidian Technology CO., Ltd , https://www.wisonen.com